china en442 radiators manufacturers
Knowledge Center
 Home >

Knowledge Center

> 5 important for the installation of vertical radiator

5 important for the installation of vertical radiator

  • 2022-01-21 19:37

As the weather turns cooler, the choice of home heating is an important guarantee for a healthy life, and radiators are becoming more and more popular in more and more families. Not only can new houses be decorated, but houses that have been renovated can also be installed.
So, what are the installation methods of the radiator, and what are the details that need to be paid attention to when installing, do you know?
 
How to install the vertical radiator
 
Exposed pipe installation
 
The water delivery pipes and return pipes of the exposed vertical radiator heating are exposed. The installation time is not limited by the decoration. The old houses that have been renovated do not need to excavate the walls or floors. The pipelines can be run along the ceiling and door frames of the room.
 
Concealed pipe installation method
 
The concealed radiator needs to be installed under the wall or floor by burying the pipe under the wall or the floor after the civil construction is completed and before the water and electricity are released. *Hang the radiator on the wall. If concealed installation is used, the floor or wall must be slotted.
 
No matter which type of installation is selected, the position where the vertical radiator hangs is critical, which may directly affect the indoor heating effect. When installing the radiator, pay attention to its stability, and connect the valve connector with the inlet and outlet valves, and use a pipe wrench to tighten the connector. When installing the radiator, don’t make a mistake about the following five “nos”!
 
1. Do not install in an unreasonable location
 
The radiator is usually installed under the window sill, which not only increases the utilization rate of the room, but also facilitates the convection of the indoor air, maintains the balance of the room temperature, and heats the air sewn into the window to protect the room from the cold. In terms of beauty, space, or heat exchange, the window sill is a good location.
 
The choice of the radiator installation position can follow the two principles of low to high and priority under the window. Generally speaking, the hot air rises and the cold air sinks. When installing the radiator, try not to be too high. The installation position of the radiator is set near the window, one is to not affect the placement of the furniture, and the other is to effectively block the discomfort caused by the entry of cold air. However, the specific installation location must also consider the interior layout, and communicate with the HVAC designer to select the location.
 
2. Do not install in a "surrounded" position
 
Some families install a heating cover outside the radiator for beauty or convenience of life; some people also like to place sofas and furniture next to the radiator. These practices are not advisable. Blocking or surrounding the radiator will not only affect its heat dissipation effect, but also bake sofas and other furniture, which may cause the furniture to be deformed and cracked for a long time.
 
3. The installation of large radiators cannot be supported without ground
 
For large-area spaces such as guest restaurants, radiators of a higher size, such as 1,500 mm, can be used to better coordinate the decoration effect, be beautiful and have a good heat dissipation effect. However, the long or large heavy radiator must be supported by the support during installation. Irregular installation will leave a safety hazard for later use.
 
4. Don't choose low-quality accessories
 
It is also very important to choose original or reliable basic accessories when installing the vertical radiator. Low-quality accessories often increase the risk of system stability and even cause water leakage.
 
5. Must suppress heating according to regulations
 
It is also necessary to complete the safety and tightness acceptance of the radiator installation. After installation, a water injection pressure test should be carried out to ensure that there are no leaks. After the pressure test is over, a pressure gauge should be installed at the end to reduce the pressure to 0.4Mpa to maintain the pressure. At the end of the pipeline pressure test, the pipeline should also be insulated to prevent possible risks in the later operation of the system.
 
The installation of the anthracite vertical radiator system is a professional job, which is related to whether it is comfortable to use, whether it is stable, whether there is a risk of water leakage, etc., to master the correct installation method and strategy to ensure a warm winter.


Copyright! 2021 Sunlike. All Rights Reserved. Powered by Vivian

IPv6 network supported

IPv6 network supported Google Anylitics Console

contact

Send A Message

Send A Message

    If you are interested in our valves and want to know more details,please leave a message here,we will reply you as soon as we can.

  • supplier
  • contact
  • email